Methodology

Data and sources

GridRecord is not a complete register of every UK energy project. Live grid figures are Great Britain only. Charts below use the same mart views as Looker Studio. See also About.

14,657

Break down by nation →

With coordinates

100%

Stuck pipeline

287,275MW

8,776 projects

UK project pipeline — capacity by technology

Click a coloured segment to filter by status, or a technology name to focus one tech.

Showing 398,241 MW · 14,657 projects

Source: DESNZ REPD via GridRecord · capacity in MW (electrical)

Top planning authorities

By total capacity in the register (includes national consents).

  • Scottish Government (S36)75,176 MW
  • The Planning Inspectorate - National Infrastructure57,675 MW
  • Marine Scotland33,132 MW
  • DECC (S36)9,184 MW
  • North Yorkshire8,988 MW
  • Doncaster6,205 MW
  • Aberdeenshire5,615 MW
  • Highland5,062 MW
  • Welsh Government (NSIP)3,750 MW
  • East Riding of Yorkshire3,673 MW

Stuck vs built (quick read)

Operational share of capacity in the current filter set.

  • Operational58,604 MW (15%)
  • Not yet operational287,275 MW (72%)
  • Other (refused etc.)52,362 MW (13%)

Statuses in approved / under construction / in planning count as not yet operational.

Developer league

Top operators / applicants in REPD by total registered capacity. Names are as published — spelling variants are not merged yet.

  • Scottish Power Renewables60 projects · 1,968 MW operational11,628 MW
  • Orsted (formerly Dong Energy)15 projects · 4,402 MW operational9,757 MW
  • RWE Renewables UK Limited21 projects · 0 MW operational7,293 MW
  • Statera Energy15 projects · 150 MW operational6,580 MW
  • BP Oil UK Limited / ENBW UK Limited4 projects · 0 MW operational5,900 MW
  • Island Green Power25 projects · 21 MW operational5,092 MW
  • Scottish Southern Energy Renewables2 projects · 0 MW operational4,105 MW
  • Innova Renewables17 projects · 0 MW operational3,831 MW
  • SSE/Equinor (formerly Statoil, formerly Forewind)2 projects · 0 MW operational3,600 MW
  • Scottish and Southern Energy (SSE)84 projects · 1,708 MW operational3,518 MW
  • NatPower UK4 projects · 0 MW operational3,500 MW
  • SSE Renewables11 projects · 350 MW operational3,162 MW
  • RWE Renewables UK Limited / Masdar2 projects · 0 MW operational3,000 MW
  • Shell New Energies / ScottishPower Renewables1 projects · 0 MW operational3,000 MW
  • West Burton Energy2 projects · 0 MW operational2,900 MW

REPD field hygiene

Share of projects with each field populated. Low fill rates mean charts using that field will under-count.

  • postcode
    80.2%
  • installed capacity mw
    90.8%
  • planning application reference
    94.8%
  • coordinates
    99.6%
  • planning authority
    99.9%
  • canonical status
    100%
  • country
    100%
  • operator or applicant
    100%

Global Energy Monitor — UK capacity

Independent tracker totals for UK power units we load from GEM downloads. Separate from DESNZ REPD on the map — do not double-count with REPD. Public preview use under CC BY 4.0 with attribution; silence from GEM is not written approval for a paid Monitor product.

4,592 UK units · 300,735 MW total (excludes GIPT integrated tracker to avoid double-count)

  • Wind
    177,187 MW
  • Solar
    52,044 MW
  • Nuclear
    47,958 MW
  • Hydropower
    15,789 MW
  • Bioenergy
    7,750 MW
  • Geothermal
    7 MW

Power plant data © Global Energy Monitor (CC BY 4.0).

Source freshness

When we last checked each feed. True one-click refresh needs the scheduled ingest jobs running in the cloud.

Looker Studio: GridRecord — mart walkthrough (internal)

SourceCadenceWe checkedStatus
Renewable Energy Planning Databasequarterly2026-09-16T15:45:26.659563000Zok
Carbon Intensity APIhalf_hourly2026-11-20T09:08:06.112127000Zok