arrow_backBack to projects
Reference: EN010135·repd:10085
Solar/England · TN25 7DE

Stonestreet Green - Solar Farm & Battery Storage

Applicant / operator: Evolution Power. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusapproved
Capacity99.9MW
Planning authorityThe Planning Inspectorate - National Infrastructure
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Passed
    in planning
  3. Now
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
Evolution Power
Coordinates
51.1022, 0.9396
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2025-11-11 · We checked 2026-09-16T15:45:16.206029000Z · As of 2026-09-16