arrow_backBack to projects
Reference: 24/00017/FUL·repd:15814
Battery / storage/England · TW17 8QA

Sunbury Battery Energy Storage System - Battery Energy Storage System

Applicant / operator: EcoDev Group Limited. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusin planning
Capacity200MW
Planning authoritySpelthorne
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Now
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Battery / storage
Developer / applicant
EcoDev Group Limited
Coordinates
51.4089, -0.4388
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2024-10-15 · We checked 2026-09-16T15:45:16.233644000Z · As of 2026-09-16