Reference: EN010168·repd:16064
Battery / storage/England · SN16 0PU

Lime Down - Battery Storage

Applicant / operator: Island Green Power. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusin planning
Capacity500MW
Planning authorityThe Planning Inspectorate - National Infrastructure
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Now
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Battery / storage
Developer / applicant
Island Green Power
Coordinates
51.5610, -2.1993
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2026-06-26 · We checked 2026-09-16T15:45:16.234933000Z · As of 2026-09-16