arrow_backBack to projects
Reference: 13/00036/FUL·repd:1615
Solar/England

Little Braxted Solar Park

Applicant / operator: Lightsource Renewable Energy. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusproposed
Capacity15MW
Planning authorityMaldon
Location confidencecoordinate

Progress track

  1. Now
    proposed
  2. Ahead
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
Lightsource Renewable Energy
Coordinates
51.8017, 0.6612
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2014-01-20 · We checked 2026-09-16T15:45:16.164540000Z · As of 2026-09-16