Reference: R/2024/0843/FFM·repd:16443
Battery / storage/England · TS10 5QW

Teesworks Battery Storage Project

Applicant / operator: Teesworks Ltd, NatPower UK. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statuswithdrawn
Capacity1000MW
Planning authorityRedcar and Cleveland
Location confidencecoordinate

Progress track

  1. Ahead
    proposed
  2. Ahead
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

Status “withdrawn” sits outside the main planning-to-operation track (e.g. refused or withdrawn).

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Battery / storage
Developer / applicant
Teesworks Ltd, NatPower UK
Coordinates
54.6093, -1.1083
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2025-11-07 · We checked 2026-09-16T15:45:16.236998000Z · As of 2026-09-16