arrow_backBack to projects
Reference: 25/00818/FUL·repd:17405
Battery / storage/England · LE16 8LP

Eckland Lodge Farm, Braybrooke - Battery Energy Storage System

Applicant / operator: Regener8 Power Limited. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusin planning
Capacity500MW
Planning authorityNorth Northamptonshire
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Now
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Battery / storage
Developer / applicant
Regener8 Power Limited
Coordinates
52.4553, -0.8597
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2025-09-12 · We checked 2026-09-16T15:45:16.241718000Z · As of 2026-09-16