arrow_backBack to projects
Reference: P13/V1664/FUL·repd:2030
Solar/England · OX13 5PA

Landmead Farm (East Hanney)

Applicant / operator: First Solar/Innogy (previously BELECTRIC Solar)/Foresight Solar Fund. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusoperational
Capacity46MW
Planning authorityVale of White Horse
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Passed
    in planning
  3. Passed
    approved
  4. Passed
    under construction
  5. Now
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
First Solar/Innogy (previously BELECTRIC Solar)/Foresight Solar Fund
Coordinates
51.6440, -1.3736
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2017-02-02 · We checked 2026-09-16T15:45:16.166808000Z · As of 2026-09-16