Reference: P1249.14·repd:2170
Solar/England

Clay Tye Farm

Applicant / operator: Green Switch Solutions. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusproposed
Capacity15.9MW
Planning authorityHavering
Location confidencecoordinate

Progress track

  1. Now
    proposed
  2. Ahead
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
Green Switch Solutions
Coordinates
51.5570, 0.3044
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2016-05-30 · We checked 2026-09-16T15:45:16.167783000Z · As of 2026-09-16