arrow_backBack to projects
Reference: 15/03057/PP·repd:3387
Onshore wind/Scotland · PA28

Beinn an Tuirc Windfarm Phase 3

Applicant / operator: Scottish Power Renewables. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusunder construction
Capacity49.9MW
Planning authorityArgyll and Bute
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Passed
    in planning
  3. Passed
    approved
  4. Now
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Onshore wind
Developer / applicant
Scottish Power Renewables
Coordinates
55.5457, -5.6115
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2020-05-28 · We checked 2026-09-16T15:45:16.174436000Z · As of 2026-09-16