REPD record·repd:3441
Onshore wind/Scotland

Tullich Wind Farm

Applicant / operator: Savills. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statuswithdrawn
Capacity180MW
Planning authorityScottish Government (S36)
Location confidencecoordinate

Progress track

  1. Ahead
    proposed
  2. Ahead
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

Status “withdrawn” sits outside the main planning-to-operation track (e.g. refused or withdrawn).

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Onshore wind
Developer / applicant
Savills
Coordinates
56.3859, -5.4822
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2010-06-09 · We checked 2026-09-16T15:45:16.174768000Z · As of 2026-09-16