arrow_backBack to projects
REPD record·repd:3648
Onshore wind/Wales

Mynydd y Gwynt Wind Farm

Applicant / operator: Zond (UK) Ltd (Enron Wind Overseas Development). Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusin planning
Capacity89.1MW
Planning authorityPowys
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Now
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Onshore wind
Developer / applicant
Zond (UK) Ltd (Enron Wind Overseas Development)
Coordinates
52.4438, -3.7103
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2014-06-06 · We checked 2026-09-16T15:45:16.176055000Z · As of 2026-09-16