Reference: DM/19/03959/FPA·repd:7823
Solar/England · TS27 4SA

Hulam Farm

Applicant / operator: Lightsource BP. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusin planning
Capacity49.99MW
Planning authorityCounty Durham
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Now
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
Lightsource BP
Coordinates
54.7231, -1.3199
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2024-05-29 · We checked 2026-09-16T15:45:16.198166000Z · As of 2026-09-16