Reference: DNS/3247619·repd:7862
Solar/Wales · LL17 0HY

Elwy Solar Energy Farm

Applicant / operator: Statkraft UK Limited. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusrefused
Capacity62MW
Planning authorityWelsh Government (NSIP)
Location confidencecoordinate

Progress track

  1. Ahead
    proposed
  2. Ahead
    in planning
  3. Ahead
    approved
  4. Ahead
    under construction
  5. Ahead
    operational

Status “refused” sits outside the main planning-to-operation track (e.g. refused or withdrawn).

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
Statkraft UK Limited
Coordinates
53.2666, -3.4628
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2022-07-01 · We checked 2026-09-16T15:45:16.198320000Z · As of 2026-09-16