arrow_backBack to projects
Reference: 22/00213/FUL·repd:8529
Solar/England · DL3

Burtree Lane - Solar farm

Applicant / operator: Darlington Borough Council / Aura Power Solar. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusunder construction
Capacity49.9MW
Planning authorityDarlington
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Passed
    in planning
  3. Passed
    approved
  4. Now
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
Darlington Borough Council / Aura Power Solar
Coordinates
54.5432, -1.5746
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2026-03-25 · We checked 2026-09-16T15:45:16.201138000Z · As of 2026-09-16