arrow_backBack to projects
Reference: 22/00358/FUL·repd:9815
Solar/England · DN22 9ER

Gainsborough Road, Saundby - Solar Farm

Applicant / operator: Enso Energy / Cero Generation. Record drawn from the DESNZ Renewable Energy Planning Database extract. Status and capacity are as published in that source.

Current Statusunder construction
Capacity78MW
Planning authorityBassetlaw
Location confidencecoordinate

Progress track

  1. Passed
    proposed
  2. Passed
    in planning
  3. Passed
    approved
  4. Now
    under construction
  5. Ahead
    operational

What it means

This is a public planning-database record, not a live operational feed from the site. Capacity is installed or proposed electrical capacity as published (MWelec). Coordinates are converted from British National Grid where available; confidence is labelled.

Technology
Solar
Developer / applicant
Enso Energy / Cero Generation
Coordinates
53.3829, -0.8221
Extract
2026-09-16

Location

1 pin

  • Operational
  • Construction
  • Approved
  • In planning
  • Proposed

Click pin or list card — popup stays on the map

Further reading

Links to dig deeper. We only store the REPD fields above today — these are curated search/official links, not scraped pages. Richer application URLs will land here when we add them to the warehouse.

Source: DESNZ REPD (OGL v3.0) · Source updated 2026-06-08 · We checked 2026-09-16T15:45:16.205027000Z · As of 2026-09-16